Sign In | Join Free | My ledscreensign.com
China Zhangjiagang HuaDong Boiler Co., Ltd. logo
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
Verified Supplier

9 Years

Home > Boiler Economizer >

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator

Brand Name : HDB

Model Number : Boiler Economizer

Certification : ASME, EN, ISO9001, SGS

Place of Origin : China

MOQ : 1 set

Price : Negotiable

Payment Terms : L/C, T/T, Western Union

Supply Ability : 500 tons per month

Delivery Time : 60~150 days

Packaging Details : Seaworthy packing

Porduct Name : Boiler Economizer

Application : Coal-fired Boilers and Waster Incinerator

Material of Base Tube : SA210A1

Keyword : Boiler Economizer Banks

Production Technique : Hot Bending, Extrusion

Loading Port : Shanghai, China

Contact Now

ASME Standard Boiler Economizer Made of SA210A1 Tubes with 210° Shields for Waste Incinerator

Product Introdution

Economizer tube is an important part of boiler, which is mainly made of seamless steel tube by bending or folding.
Cast iron economizer consists of a series of horizontal cast iron pipes connected to each other with cast iron elbows and flanged ends.

Parameters of Boiler Economizer

Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator

Working Process of Boiler Economizer

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

Company Profile

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator


Product Tags:

Hot Bending Boiler Economizer

      

Boiler Economizer With 210° Shields

      

Boiler Economizer For Waste Incinerator

      
Quality ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator for sale

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)